Project Summary

  • EPC:    Bechte; 
  • LOCATION:   Texas, USA
  • TIMELINE:   2016 to 2025 (ongoing Stage 3)
  • END USER:   Cheniere

Project Overview

Cheniere and Bechtel completed Train 1 at Corpus Christi LNG in February 2019, becoming the first liquefaction train placed into operation at a greenfield liquefaction facility in the lower 48 states.

Nessco TSI Team has been onboard the project with Bechtel since 2017, providing the Telecoms Systems Integration plus Site Telecoms Construction.

Corpus Christi LNG; Stage 1 (Trains 1-2), 2 (Train 3), and 3 (7 Mini trains)

Project Scope

Nessco scope of work includes:

  • Network
  • Construction Installation Services
  • Marine Radio System
  • Plant Radio System
  • CCTV
  • Structured Cabling
  • PAGA
  • Basic and Detail Design, Sourcing, Build, Integration, FAT, Commissioning, SAT