Back to Projects

Project Summary

  • EPC:    SBM 
  • LOCATION:   Guyana
  • TIMELINE:   October 2020 to 2024
  • END USER:   ExxonMobil

Project Overview

Telecoms Systems Integration Replica Concept to design one build across many offshore Platforms for Shell.

Project Scope

Nessco scope of work includes:

  • Installation And Commissioning Spares
  • Microwave Radio Link (Client)
  • Termination (Client)
  • Upstream Equipment Health Monitoring
  • Subsea Fiber And Das Optic Cable Termination
  • Modu Esd Radio (Client)
  • 4G LTE Wireless Communication (Client)
  • Wireless Mobility (Client)
  • Tanker Berthing Aid & Positioning System
  • Navigational Aid System
  • Telecom Shutdown System
  • CCTV System
  • Integrated Vsat System (Sbm & Client)
  • Entertainment System
  • Weather Radar System
  • Weather Monitoring System
  • Uhf Radio (Client)
  • Operational Radio System (SBM)
  • GMDSS
  • LAN and ODSS System (Client)
  • LAN System (SBM)
  • Telephone System (SBM)
  • PAGA System
  • Basic and Detail Design, Sourcing, Build Integration, FAT, Site Commissioning, SAT

Your project matters – let’s get started!

We want to work with you.