Project Summary

  • EPC:    SBM 
  • LOCATION:   Brazil
  • TIMELINE:   October 2020 to 2024
  • END USER:   Petrobras

Project Overview

The FPSO is the first high-capacity unit to be installed in the Buzios field, with the potential to produce up to 225,000 barrels of oil per day (bpd) and process up to 12 million cubic meters (420 million cubic feet) of gas per day. The FPSO will be deployed at the field in fulfilment of a 26-year lease agreement between Netherlands-based SBM Offshore and Brazilian state-owned oil company Petrobras.

Project Scope

Nessco scope of work includes:

  • 4G LTE Infrastructure
  • Subsea Fiber System
  • Audio Video Recording System Electronic People On Board (E-POB)
  • Navigational System Telecom Shutdown System Dynamic Positioning Berthing System CCTV System
  • VSAT System
  • Back Up C-BAND VSAT System
  • Operational Radio System Entertainment System UHF TV System
  • GMDSS
  • LAN, Telephone System, Video Conference System
  • PAGA System
  • Moda Riser Monitoring System Permanent Reservoir Monitoring PRM) System
  • Metocean System Positioning System Position Reference System (POS)
  • Basic Design, Detailed Design, Sourcing, Build Integration, FAT, Site Commissioning, SAT