Project Summary

  • EPC:    Dragados 
  • LOCATION:   Germany
  • TIMELINE:   
  • END USER:   Amprion

Project Overview

Dragados Offshore, S.A. in Consortium with Siemens Energy, will develop, build and deliver the HVDC Grid connection platforms of DolWin4 and BorWin4 for Amprion Offshore GmbH. Each project consists of a 900-megawatt capacity system for the transmission of energy. Dragados Offshore is responsible for providing jackets and topsides (including detail design and engineering, procurement, fabrication, construction, load out, transportation, installation, hook‐up and commissioning for the two (2) platform systems.

Project Scope

Nessco scope of work includes:

  • Dynamic Positioning System Option
  • Mobile Network
  • ATIS
  • Replica System
  • Navaids
  • Weather Monitoring
  • FO System
  • Telephony/PBX
  • VSAT
  • PAGA
  • Office IT LAN
  • LAN/WAN
  • CCTV
  • DACS
  • LOS Hardware
  • VHF Radio & GMDSS
  • DMR Radio
  • Basic and Detailed Design, Sourcing, Build Integration, FAT, Site Commissioning, SAT