Project Summary

  • EPC:    Bechtel 
  • LOCATION:   Louisiana, USA
  • TIMELINE:   October 2013 to 2024
  • END USER:   Cheniere

Project Overview

Cheniere and Bechtel completed Trains 1 and 2 at Sabine Pass LNG 2016. Additional stages followed up till 2021 adding 4 more trains.

Nessco TSI Team has been onboard the project with Bechtel since 2013, providing the Telecoms Systems Integration plus Site Telecoms Construction through 4 Stages.

Sabine Pass LNG; Stage 1 (Trains 1-2), Stage 2 (Train 3-4), Stage 3 (Train 5), Stage 4 (Train 6)

Project Scope

Nessco scope of work includes:

  • Construction installation services
  • Marine Radio System
  • Plant Radio System
  • CCTV
  • Network
  • Structured Cabling
  • PAGA
  • Basic and Detail Design, Sourcing, Build, Integration, FAT, Commissioning, SAT